Edgewater was contracted recently by Frontenac Property Management to create two new doorways in solid 2’ Limestone walls as part of a rehabilitation project at FPM’s new head office. The scope of work involved dismantling the existing walls and using matching materials to create the new openings. By matching details such bonding (stone arrangement), mortar joint colour and texture, and rough sawn wood beams, these new openings are blended seamlessly with their historic surroundings.